Shandong Yankuang Group 300.000 Ton Caprolactam Project

  • Shandong Yankuang Group 300.000 Ton Caprolactam Project (4)
  • Shandong Yankuang Group 300.000 Ton Caprolactam Project (5)
  • Shandong Yankuang Group 300.000 Ton Caprolactam Project (6)
  • Shandong Yankuang Group 300.000 Ton Caprolactam Project (7)
  • Shandong Yankuang Group 300.000 Ton Caprolactam Project (8)
  • Shandong Yankuang Group 300.000 Ton Caprolactam Project (9)
  • Shandong Yankuang Group 300.000 Ton Caprolactam Project (10)
  • Shandong Yankuang Group 300.000 Ton Caprolactam Project (11)
  • Shandong Yankuang Group 300.000 Ton Caprolactam Project (12)
  • Shandong Yankuang Group 300.000 Ton Caprolactam Project (13)
  • Shandong Yankuang Group 300.000 Ton Caprolactam Project (14)
  • Shandong Yankuang Group 300.000 Ton Caprolactam Project (1)
  • Shandong Yankuang Group 300.000 Ton Caprolactam Project (2)
  • Shandong Yankuang Group 300.000 Ton Caprolactam Project (3)

Proyek kaprolaktam Lunan 300.000 ton/taun Grup Shandong Yankuang Pabrik Kimia Lunan dumunung ing Tengzhou, Provinsi Shandong.Sajrone wiwitan
proses Penawaran construction camp engineering ing 2019, kita ngenalaken kanggo pelanggan model anyar pangiriman sakabèhé saka construction camp, rumiyin tresna dening pelanggan.

Pungkasane, klien kanthi tegas nilar cara lawas asli kanggo tuku omah konstruksi sementara, lan ngrangkep konstruksi kabeh kemah menyang Chengdong.Saka planning camp sakabèhé, desain produk camp, produksi lan Processing materi, kanggo procurement bahan pendukung njero ruangan ruangan lan
transportasi, lan konstruksi ing situs.

Ing sisih siji, produksi produk omah ditindakake ing pabrik, lan ing sisih liya, kabeh tim elit diatur kanthi cepet kanggo nyiapake menyang
garis ngarep situs construction sawise Festival Spring Taun Tikus.

Ing wayahe kritis, bencana global sing gedhe - wabah korona anyar wis kedadeyan, nanging kabeh kesulitan ora bisa nahan kita.On Maret 8, tim proyek kita
perusahaan ngadhepi risiko gedhe saka epidemi lan miwiti construction ing situs.

Proses konstruksi ing wabah kasebut angel, nanging asil pungkasan nyemangati.Ing istilah planning camp lan desain, kita tindakake konsep anyar saka
construction camp, kualitas, humanization, Intelligence, lan greenization kanggo ngrampungake..Ing syarat-syarat pilihan jinis kamar, sesuai karo kabutuhan pelanggan kanggo
wilayah kantor terpusat gedhe-span, kajaba kanggo bale pameran situs kimia pinter, kang dibangun karo struktur baja H amarga dhuwur dhuwur lan span gedhe, liyane saka jinis kamar sing dibangun karo produk ZA anyar paten Chengdong kang.Kamp kantor sementara kabeh kasusun saka bangunan kantor, ruang rapat, restoran, teras, lan ruang pameran.Jembaré 8.625 mèter persegi, kalebu 3.741 mèter persegi bangunan.