Beijing Metro Line 19 Proyek No.08

  • Proyek Metro Beijing Line 19 No.08 (2)
  • Proyek Jalur Metro Beijing 19 No.08 (3)
  • Proyek Metro Jalur 19 Beijing No.08 (4)
  • Proyek Metro Jalur 19 Beijing No.08 (5)
  • Proyek Metro Jalur 19 Beijing No.08 (6)
  • Proyek Metro Beijing Line 19 No.08 (7)
  • Proyek Metro Beijing Line 19 No.08 (8)
  • Proyek Jalur Metro Beijing 19 No.08 (9)
  • Proyek Metro Jalur 19 Beijing No.08 (1)

Bubar, situs web Capital Window ngumumake status perencanaan subway Beijing taun iki.Ana total 20 subway sing lagi dibangun.Jarak tempuh uga bakal mundhak dadi 638 kilometer.Chengdong uga melu lan nyumbang kekuatan dhewe kanggo construction ibukutha!

opsi omah Camp lan solusi

Tahap konsultasi proyek awal: Anjie Chengdong nyedhiyakake rencana omah kontainer lan Beijing Chengdong nyedhiyakake rong rencana omah tipe K.Pelanggan pungkasan milih solusi produk Anjie Chengdong.

Tata letak sakabèhé kemah kasebut dipérang dadi kantor manajerial, area akomodasi, lan area urip buruh.

Wilayah kantor kanggo personel manajemen: Bangunan kantor utama lan asrama kanggo personel manajemen nggunakake omah wadhah Anjie Chengdong lan kamar fungsional sing ndhukung dilengkapi produk Beijing Chengdong kanggo ruang rapat, ruangan kegiatan staf, kantin lan akomodasi buruh.